Which of the following is considered one of the 7 wastes in production?

Prepare for the FBLA Supply Chain Management Test with flashcards and multiple choice questions. Each question includes hints and explanations. Ensure your success and confidence on the exam day!

The concept of the 7 wastes, originating from Lean manufacturing principles, emphasizes the identification and reduction of non-value-adding activities to improve overall efficiency in production processes. Among these wastes, waiting time is a significant contributor to inefficiency.

Waiting time occurs when resources, such as human labor, machinery, or materials, are idle and not contributing to production due to delays or bottlenecks. This period of inactivity increases lead times, slows down production, and often leads to frustration among workers waiting for the next step in the process or required input. By identifying and minimizing waiting time, organizations can streamline their operations, enhance productivity, and ultimately improve their bottom line.

In contrast, the other options listed—optimal processing, underproduction, and streamlined logistics—are not classified as wastes within this framework. Optimal processing seeks to achieve the most efficient method of production. Underproduction refers to not producing enough items to meet demand, which can lead to stockouts rather than waste. Streamlined logistics focuses on improving the movement and storage of goods rather than identifying wastes. Therefore, waiting time stands out as a clear example of a waste that organizations must address to enhance their production efficiency.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy